The Engineering Technician cooperates with his / her superior to ensure the normal operation of hotel equipment. This role is responsible for the general work order maintenance work assigned by his / her superior or assisting the Engineering department’s maintenance team in completing other maintenance work.
配合上级酒店设备正常运转,负责完成一般性工单维修工作,并依照上级安排单独或配合工程部维修组完成其他维修工作。
Assist the Engineering superior with general hotel and building maintenance and ensure that work is completed to a high standard within your established trade which meets the needs and
expectations of your customers.
协助工程主管负责整个酒店及大厦的维修,确保在你的专业领域中高标准完成工作并满足客户的需要和期望。
Attend PMM work in the guest room.
负责客房内的PMM工作。
Attends building repair and maintenance work in the Hotel premises including any new
additions / extensions to the Hotel or any other properties maintained by the Hotel.
负责酒店内的维修工作,包括酒店的任何新的补充/扩展或酒店维修的任何物业事项。
Participates in Hotel Energy Conservation Program.
参加酒店节能计划。
Use initiative and foresight to ndertake tasks outlined within the preventative maintenance program without the direction of the Shift Engineer/Chief Engineer.
在没有当班工程师/总工程师指导的情况下,主动并预见性的着手于预防性维修计划中规定的工作任务。
协助工程总监进行文字事务性工作并建立工程部各种档案系统,确保定期向总监汇报信息,熟悉酒店内部的各种工作程序。
Assist the Director of Engineering for text transactional work and established a variety of file systems engineering department to ensure regular reporting of information to the Superintendent, familiar with a variety of in-house procedures.
• 建立各种工程文件的档案系统。
• Establish a variety of file systems engineering documents.
• 作工程部会议纪要。
• Do engineering department meeting minutes
• 向总监报告所有下属员工的信息。
• Report all subordinates of information to the Commissioner.
• 建立各岗位的考勤考绩记录档案,及时掌握各技术岗位的完成工作量情况和工作质量情况,按规定制度要求,提出对各岗位的奖罚方案并交部门经理审批。
• Establish performance appraisal of each job attendance records archive, to grasp the situation and work to complete the work of the technical quality of the situation post, according to the provisions of the system requirements put forward for each position of reward and punishment scheme and cross department manager for approval.
• 根据部门工作会议决议负责做好工作检查落实和协调。
• Responsible for the implementation and coordination of inspection do the work in accordance with resolutions of the meeting department.
• 及时完成部门总监临时交给的各项任务,完成后及时报告。
• Timely completion of the tasks assigned by the temporary director, promptly after the completion of the report.